Saturday, July 24, 2010

Knee Wall Constructed

Well for those who don't know what a Knee Wall is... like myself. A knee wall is a half wall. We looked into getting a new banister made, how ever the lack of money and trying to get this house put back together faster we have time to save the money we needed for the banister. We used the savings we had for a fence and a new washer. So for a approximately 50 dollars we constructed a wall. We will then cap the top of the wall with a niced finshed piece. We will put in a nice iron railing on the lower end of the stair case.

New Sub Floor Installed

Today we installed new subflooring in the upstairs hall and the small bedroom. I am hoping that carpet will soon follow. Maybe the end of September... if I am really lucky maybe sooner. :)

Laundry Room Wall Cabnits


Laundry Room Wall Cabnits are being installed. The Laundry room still needs some additional finishing work, but it should soon be complete.

Friday, July 23, 2010

Welcome

We are having our house appraised in the morning. I looked on a few websites about how to prepare for an appraisal. One of the suggestions was plant some flowers. So I did just that. I went to Lowes found clearance pots and bought some flowers. Remy is the welcoming committee.

Tuesday, July 13, 2010

FENCE


We lost our old fence to a wind storm back in April. With a dog it is really hard not to have a fence. It means we have to get fully dressed to take him out in the middle of the night to use the bathroom.
Well we are so lucky to have neighbors who would split the cost of this fence. The fence is nearly complete. We have 3 more sections and this side will be complete until we have enough money to install a double wide vinyl gate.

Friday, July 9, 2010

STUMP MUNCHER






It took 4 hours. But all 5 Tree stumps we had in our back yard are now gone. This morning Bruce rented a stump muncher. No more tree stumps in our back yard. Next remove railroad ties, then trench for a new sprinkler system. Diamond Rental has made about one thousand dollars off of us in rentals over the past 3 years. That cost is minimal compared to what we would have had to pay a professional to take out the trees and remove the stumps. So in the long run it is money in our pocket.

Wednesday, July 7, 2010

Fence Posts are Installed


Our 4th of July weekend we spent ripping out railroad ties and over grown shrubs, in addition to installing the fence posts to our new fence. We will finish installing the rest of the fence this weekend. We are so lucky to have such great neighbors who split the cost of the fence with us.

Friday, July 2, 2010

EXCAVATOR










Today Bruce rented a mini excavator. We attempted to pull out the stumps, but we will have to rent a stump grinder for those. We did accomplish some of what we set out to do and a little more. We did get the railroad ties removed,we got rid of the basketball hoop and we pulled out some extremely overgrown shrubs in the back yard. The mini excavator cost 150 dollars to rent, we used it all day long. We may now be future skin cancer patients, but at least we got rid of the ugly railroad ties, basketball hoop and overgrown shrubs.

Thursday, July 1, 2010

Masterbath Shower Fixtures


Jessica found out the hard way oil rubbed bronze is the most expensive finish, hence the reason it has taken some time to finish our masterbath. One of the valves is missing in the picture because it was scratched, so Jessica sent it back to Kohler. Jessica refuses to spend 300.00 and have a scratched fixture. So we are awaiting the arrival of the new valve.

Say Goodbye To The Railroad Ties, Tree Stumps and Baskeball Hoop.


Tommorow we will start ripping out the railroad ties, stumps and basketball hoop in the back yard. We will then begin to putting up a new vinyl fence once we have done the demo.